5
News archive

Infrastructure news archive

Infrastructure news

30 loka
SSAB’s steel piles help Port of Gdańsk to jump up on the podium
A crane moves a huge steel pile to the waterline of the future harbor wharf in Gdańsk, Poland. The pile is placed in a perfectly vertical position. A vibro hammer and then an impact hammer press it down several meters below the bottom of the canal. The new wharf at the Port of Gdańsk will be operational next year.
28 tammi
SSAB:n Teräspaalupäivä 2019 pohjarakentamisen asiantuntijoille Helsingissä
Vuosittain järjestettävä SSAB:n Teräspaalupäivä kokosi 17.1.2019 Helsinkiin 350 urakoitsijaa, suunnittelijaa, laitevalmistajaa ja viranomaisten edustajaa kuulemaan SSAB:n tuotteiden käytöstä infrastruktuurirakentamisessa ja keskustelemaan pohjarakentamisen ajankohtaisista asioista.
25 tammi
Pohjarakentamisen asiantuntijat SSAB:n Teräspaalupäivässä Helsingissä
Vuosittain järjestettävä SSAB:n Teräspaalupäivä kokosi 18.1.2018 Helsinkiin 350 urakoitsijaa, suunnittelijaa, laitevalmistajaa ja viranomaisten edustajaa kuulemaan SSAB:n tuotteiden käytöstä infrastruktuurirakentamisessa, asiakkaiden referenssikohteista sekä alan näkymistä.
23 syys
Environmental product declaration for SSAB’s tubular products is now registered in EPD-Norway’s program
SSAB's EPD for piles, structural hollow sections, precision tubes, line pipes and steel sections are now published in the EPD-Norway, Norwegian EPD program for products (EPD = Environmental Product Declaration). An EPD gives information about a product’s environmental issues and environmental impacts.
26 helmi
RRs220/10 – A new member to the strong RRs pile family
New RRs220/10 pile size widens SSAB’s high-strength steel RRs pile selection. The use of high-strength steel piles has been growing and this new size answers to those needs.
26 helmi
SSAB’s RDc casing tubes save up to 90% installation time
SSAB ‘s RDc casing tubes are intended for various casing tube applications installed by drilling and where a reliable and, above all, cost-effective splicing technique is required. Use of a threaded splice can save up to 90% of time at the installation stage compared to a traditional welded splice. Each splice takes around just 1-2 minutes.
26 helmi
Mechanical splices available to even larger RD pile sizes
SSAB offers now threaded mechanical splice also for RD270/12.5 pile size. Mechanical splicing reduces the need for welding on site. The quality of the splicing will be good in all weather conditions.
26 helmi
SSAB’s Steel Pile Day brought foundation construction professionals to Helsinki, Finland
The 9th Steel Pile Day has been established as an event in which professionals in the field in Finland gather annually. On 21 January 2016, there were again over 300 participants, a third of which were design engineers, a third were contractors and the rest were e.g. authorities and students.
26 helmi
New PileWallCalc design tool has been launched
Calculation of cross section properties and bending resistances of the pile walls is easy with SSAB’s new PileWallCalc design tool. The program calculates the bending resistances and normal force resistances of RD pile wall, Combi wall and Zig-Zag Combi wall.